Quantcast
Channel: SCN: Message List
Viewing all 8902 articles
Browse latest View live

Re: Intercompany resource related billing for projects

$
0
0

Paulo,

 

I do understand the CO-FI integration is a separate topic , but we do have a use here. It will not substitute the billing process but should act as source to billing.

 

I was just trying to use cross company cost allocation to serve as basis for RRB. In DIP profile we have an option of source as " Actual line items" and " Intercompany line items".

I was trying to trigger RRB on " Intercompany line items".  What you are suggesting above will be triggered on "Actual line items". We don't have any trigger point for Intercompany line items. It's regular SO-PO scenario.

 

Also, in your scenario, you will have to bill the customer for Colombian employee at costs +% basis, as you have no collection of Colombian employee activity in US WBS. My requirement is to bill end customer on basis of Hours booked.


Re: Detect finishing of replication process

$
0
0

Stephan,

 

Thanks a lot for the info.  It really helps. 

 

I was looking for a table where I could see the list of all shadow tables.

 

Best,

 

Pawel

Re: Webi Report can not edit

$
0
0

Hi,

 

what is the issue.second screenshot is not complete compare to first one.

 

Amit

Re: how to select distinct records from a database table

Re: Creación de pedidos en base a mínimos,necesario y máximos

$
0
0

Es precisamente lo que te comenté desde el principio, que el MRP toma como fuentes todos los documentos que afectan a tu formula del disponible, la cual es

 

Stock+Solicitado+Comprometido=Disponible

Users setting on SAP NW 7.4 PO on localhost

$
0
0

Hello.

 

Somebody know witch user are setting when i install SAP NW 7.4 on localhost?

 

Thanks

Re: master data

$
0
0

I was mistaken about something: you will need to know the technical field names on the data entry screen if you use LSMW. See How to Create a Sample LSMW, which as part of stepping through the LSMW process, includes instructions for how to determine the technical field names needed.

 

Glenn

Re: Looking for Solution to "Set IM Last Count Date to Create Date for new SLOCs"

$
0
0

I understood your desire already earlier and still think that a z-report that does this update in a scheduled night run  (e.g. by copying the last receipt movement date into that storage location last inventory date) is the easiest way to get it done.

There is a BADI BADI_MATERIAL_REF to default values in material master creation, I don't know if SAP runs through this BADI if the material master storage location view is automatically created, nor do I know if you can update a field which is not maintainable manually, you can try.


Single System Landscape in Screen 3.0

$
0
0

Hi. I want to install release 3.0 SP01. We were examining this case and have a question regarding the landscape . Can I use Single System Landscape (Minimal System Landscape) as it could be done in version 2? That is central and receiver in same system.  In the case that is compatible, should I have something in mind? Any comment will be helpful.

 

Thank you very much!

Re: Multiple Open Session Prompt retreiving universe in Information Design Tool

$
0
0

Hi Amit,

 

I try the solution you gave but the issue still the same, is there any workaround I can use solve this problem?.

 

Thanks and best Regards.

Re: Creating an order with reference to a quotation

$
0
0

2015-09-10_2-09-00.png

Hi so i am getting this error when trying to create a new order with reference to a quotation after the previous orderi created  has been rejected.

 

How to tackle this and also even though i have rejected the previous order it still shows as complete.

Re: DB partitioning vs semantic partition objects

$
0
0

Hi,

 

First of all, SPO and DB partitioning do not exclude each other, they are complementary. You can use SPO in conjunction with DB partitioning. SPO will generate the PartProviders based on the partitioning Characteristics and with the SPO template InfoProvider, you can define DB partitioning (i.e. the entire range of partitions).

 

The advantage of DB partitioning is better performance in query processing / reporting but also other data warehouse activities like archiving can take advantage.

 

DB partitioning means that a big table if split up in multiple partitions. E.g. an SPO PartProvider can be Fiscal Year 2015. E.g. the DB partitions can be Fiscal Year/Period 001.2015, 002.2015, ... 014.2015).

At query run-time, very often comparisons are made. E.g. Fiscal Year/Period 001.2014 - 003.2014 against 001.2015 - 003.2015. The database will be able to very efficiently only retrieve data in the respective Fiscal Year/Period partitions instead of 2 entire Fiscal Years. This is called: Partition Pruning, i.e. excluding all DB partitions which are not relevant from a data retrieval point-of-view.

 

Best regards,

Sander

Manager unable to approve employee's time as employee was terminated

$
0
0

Hi All,

       I have an issue for one of the employees working with my client. The employee was terminated in the system on september 5th and the manager is trying to approve his times for the few days he worked in that pay period but was unable to do so. Is there a possibility like the manager can approve the employee's time even after the employee is terminated in the system within that pay period? If not, please provide an alternative solution for this and what is the best that could be done inorder to approve his time. We are using CATS to record time.

 

Hope to see a solution for this soon.

 

 

 

Regards,

Satish

JSM : Job Documentation ID Table

$
0
0

Hello,


I have read that Job Documentation was a document stored in a flat table.

Can you tell me what is this table ?

How can I find the link between Job Document ID and the UUID of Job Documentation ?


Thank you for your answer.

Number range issue in KANK

$
0
0

Hi Experts,

 

I am facing an issue related to Number ranges.

I have 10 number range intervals in CO.

 

No               From No               To number      NR status

 

01               0100000000          0199999999     0

02               0200000000          0299999999     0

03               0300000000          0399999999     0

04               0400000000          0499999999     0

05               0500000000          0599999999     0

06               0600000000          0699999999     0

07               0700000000          0799999999     0

08               0800000000          0899999999     0

09               0900000000          0999999999     0

10               1000000000          1099999999     0

 

Now i am trying to create group in KANK and trying to put existing interval 0100000000 to 0199999999,but system not accepting and throwing an error i.e.Enter intervals without overlap.


Bur as per my client requirement i should use only from the existing number ranges from 01 to 10.I cannot delete existing intervals.

Could you please tell me how to resolve this ASAP.


Thanks

Mohammed Rafi


why assign function module to process code? IDoc

$
0
0

Hello,

In inbound and outbound interfaces, we see function module is assigned to a process code. Why?

If the SAP design would have been to directly input function module in partner profile, for inbound and outbound; instead of process code, wouldn't the processing have worked? In other words, what is the reason for linking partner profile to process code and then process code to function module?

Thanks!

TW

Re: How to Connect OITW, OPOR, POR1

$
0
0

I did the table connections as you said but still the dates are pretty unrelated.

Re: Currency Symbol to Change

$
0
0

I checked & found that local currency is not an editable field at Administration->System Initialization->Company Details->Basic Initialization->Local Currency.

Re: Internal table compare does not fetch records.

$
0
0

Don't worry.... some times it happens

Open BPC-Excel-File from Server

$
0
0

Hi I would like to open an Excel-File via a Button (with VBA)  which is stored on the BPC Server.

 

I think that the function "OpenSpecificDocumentByModule" should be right for this Job but I dont't know how to pass the correct Parameters

 

  • documetName = myfile.xlx teamId = is this mandatory?
  • subFolderRequest = ??? how to pass this one? slash or backslash
  • subModule = What's that?
  • Module = What's that?

 

An example whould be great

 

 

Thx

Viewing all 8902 articles
Browse latest View live




Latest Images