Quantcast
Channel: SCN: Message List
Viewing all 8902 articles
Browse latest View live

Unable to create Valid When Association in Parent Generic object

0
0


Hello Friends,

 

I have two Standard MDF objects as Legal Entity and Work Schedule.

 

I am trying to create an Association in Legal Entity. Intent is to show all the Work Schedule associated to Company code.

 

For this to happen I have created Association in Legal Entity.  Have specified the field as Work Schedule and Association type as "Valid When"

 

On Save of the Legal Entity page in EC, I am getting the following message

 

"Cannot create the field Criteria  GOFieldCriteria

 

Any help on this is appreciated

 

Thanks and Best Regards,

 

Rohit

Cell : +1 312-371-9191


Re: sub contracting an operation in production process

0
0

Dear Rajiv,

 

If you create one dummy material then it might be create complexity for you.

 

If you are creating two dummy material, Suppose A - To be sent to Vendor & B - to be recieved from vendor.

 

Material A will be assigned to the sub operation.

 

BOM of material A contain material B.

 

Hope this will clear you.

 

Regards,

Viral S.

Re: Core Interface between APO and ECC

0
0

Hi Gomathi,

 

There are already good source of information shared by others. However I suggest you to read below article as well,  here is the link -

CIF - The Core Interface - SAP Planning

 

Hope this will help.

 

Thank you

Satish Waghmare

Schedule VI format as per act Print out from SAP

0
0

Hi experts,

 

Do you have any idea about schedule VI format as per act print out from SAP? How can we generate it in SAP? Is their any report (transaction code) available in SAP ERP?

What should be the process? We are supposed to write a program to get this report, just started analyzing it. Any guidance on this would be very helpful.

Re: BDC/LSMW for Maintenance Package assignment to Task list operations

0
0

Hello,

 

 

Thank you for yourreply! My problem has resolved.

 

I have another question,now i want to create a single cycle plan with counter.

 

My purpose is create a maintenance order automatic  every 10 working hour.

 

The firist time i scheduling for the maintenance plan , the plan create a maintenance order automatic,but later never produce a maintenance .

 

Who knows the reason?

 

1. measuring point

 

 

2. maintenance plan

3. measurement document

 

4. schedule

 

Br

Ray

Schedule VI format

0
0

Hello,

Every one,

 

Can any one please explain me what is schedule VI format,

I got the requirement SCHEDULE VI FORM AS PER ACT PRINT OUT FORM.

Please any one explain me about this requirement,in which t-code i have to analyse and other information.

 

Thanks&Regards,

Sagar.K.

Re: Regarding Scheduling of Counter based maintenance plan

0
0

Hello,

 

I have the same question,now i want to create a single cycle plan with counter.

 

My purpose is create a maintenance order automatic  every 10 working hour.

 

The firist time i scheduling for the maintenance plan , the plan create a maintenance order automatic,but later never produce a maintenance .

 

Who knows the reason?

 

1. measuring point

 

 

2. maintenance plan

3. measurement document

 

4. schedule

 

Br

Ray

Capture Opex costs in SAP-PPM

0
0

We are on PPM 6.0.

We are required to show the costs posted in cost center, into the Financial Planning View.

We do not have a PS WBS to pull these costs from.

 

In summary, the opex costs posted onto cost centers are to show in SAP-PPM, without the PS WBS to pull that cost from.

What os the way out?


Re: Problem with SUM 1.0 SP13 , LIBPATH incorrect after restart of upgrade server

0
0

Hi Charles,

 

I think your suggestion will probably make the current step work, but I am hesitant about doing this,

in case I get other problems because of LIBPATH being incorrect.

 

I checked the LIBPATH being used by the Upgrade before and after the restart and a few other directories were removed.

This is the full list of directories removed from LIBPATH

:/usr/lib:/lib:/usr/sap/B1X/SYS/exe/run:/usr/sap/B1X/SYS/exe/uc/rs6000_64:/usr/sap/B1X/hdbclient

 

thanks for your suggestion.

 

Tom

Re: JCO in eclipse

0
0

Hi,

 

I have gone through samples of JCO but they only provide the code. I need to know how to set up and then write a code for JCO and where.

 

 

Regards,

 

Asia

Re: Electricity consumption

0
0

Hi Jogeswara Rao Kavala

 

I completely agree with what you said as earlier we too thought the nearly the same thing  but as far as I feel for every PTTXT we will have to check these .Suppose for TCM1 hour and energy meter we put a check that if PTTXT equals TCM1 then display the values but there are lots of machines and for every machine we will have to do this .I feel  it will add complexity to the code.So could you give me an idea how to acheive this.

 

 

Regards

Nav

Re: Creating account with CRM or ERP data source

0
0

Using the function module CUAN_CE_IC_POST_FLAT or CUAN_CE_INTERACTIONS_POST_FLAT, how can we differentiate whether we are creating an account or contact in hybris marketing?

Re: Winhelp in Windows 10

0
0

Worked for me! Thanks.

Re: SNP Deployment: User-defined Fair-Share Rule 'X' logic is not considered when Supply exceeds Demand

0
0

Hello PK

 

Please share details on Custom BADI logic - business requirement and technical reason you decide to implement Custom BADI solution instead of any Standard option, what is the functional logic incase of Supply > Demand and Supply < Demand. 

 

May be once we have more details on the Custom logic, we will be able to suggest something.

 

Thank you

Satish Waghmare

Strategy Mgmt Page Stop loading @ 96%

0
0

Strategy Mgmt Page.PNG

Hi Friends

 

Pl. find enclosed screen shot. Strategy Management Page stopped loading @ 96%. We are on SSM 10.1 SP9 and I verified all Model Connections are fine. It was working fine earlier. Pl. advise

 

Rgds

Sri G


Re: Mapping Problem

HR Trigger error on "No data found for Action ID"

0
0

hi SAP Expert,

 

Currently I'm trying to configure a HR trigger from ECC (Sandbox) to GRC, but notice when I update a infotype 0105 subtype 0001, is giving an error on my GRC SLG1 as attached, any comment would be appreciated.

Screen Shot 2015-09-27 at 10.11.34 am.png

Thanks,

Hariyono

How to assign multi color in single Cell.

0
0

Hi Guys,

 

How to assign Different Colors based on User Response Function

 

Ex: User response(“Year: 2005”)+user response(“Month: June”) I want Year is a different color and Month with other color.

 

Kindly suggest me.

 

System:

 

webi 3.1 sp6

Re: Is it possible to create local members on the template to calculate YTD / YTG total?

0
0

Hi Yee,

 

Can you share the screenshot of how you configured HNULL@MTHPRD = NULL (I/P KF1@MTHPROD)

 

What does "I/P" mean?

 

@Raghav - Does on-premise support "NULL" value assignment?

 

Regards,

Aditya G

Re: Metadata Extraction from IBP HANA DB

0
0

Hi Parveen,

 

Thanks for your response.

 

Can you explain what you meant by "Instead, you can directly export the data out of these tables directly from HANA."

 

How can I export them from HANA? Do I get access to HANA?

 

Regards,

Aditya G

Viewing all 8902 articles
Browse latest View live




Latest Images