Going by the error, there is a duplicated operation number.
I have not edited any number ranges or operations. We just finished with the latest hotpacks and last week we entered a new HR patch, but I wouldn't think that would affect PM.
Inconsistent data: Order 70007980 12/01/2013, duplicate entry O
Message no. C2327
Diagnosis
Processing had to be canceled due to inconsistent master data or order data. The system found duplicate entries for object O (abbreviation meaning, see below).
System Response
Processing for this order was canceled.
Procedure
For inconsistent order data, the order number is given. For inconsistent routings, the plan number is given.
Inconsistent order data
The order number and master data explosion date is given. Examine the order in the order information system in the object overview, and display all objects. You might be able to see the duplicate objects here. Try and find out the origins of the duplicate entries, then contact SAP to resolve the inconsistency.
Inconsistent routing
The plan type, plan number, plan alternative, and explosion date are given. Correct the routing and perform a check for the routing. If there are inconsistent relationships (object R), generate these again in the recipe and make sure that they are not recursive.
Objects
Abbreviation | Object | Data given for object |
---|---|---|
A | Order | Order number |
3 | Item | Item number and material number |
S | Sequence | Sequence type and sequence number |
O | Operation | Operation number |
U | Suboperation | Operation number and suboperation number |
M | Component | Material number |
R | Relationships | Operation/Phase |